
Project Background
A franchised dealership building a new after-sales workshop needs eight productive bays, one alignment bay and a tyre corner, all delivered in one shipment and installed before opening day.
Project Scope
| Bays | 8 repair bays + 1 alignment bay + tyre corner |
|---|---|
| Ceiling | 4.5 m clear |
| Power | 380 V, 3-phase, 50 Hz |
| Shipment | 1 × 40 ft HQ container |
Our Solution
- Clear-floor two post lifts in the repair bays so transmission jacks and oil drains roll freely underneath.
- A 4-ton four post alignment lift with turntable recesses paired with a 3D wheel aligner.
- Tilt-back tyre changer with power assist arm and a laser wheel balancer for low-profile tyres.
- Support kit per bay: under-hoist stand, low-profile oil drain, creeper and mechanic seat.
Project Process
- LayoutWe mark lift positions, column clearances and power points on the floor plan.
- Sampling & approvalColour, logo and power unit voltage confirmed in writing.
- ProductionAbout 25 days; each lift is load tested before packing.
- LoadingLifts and tools packed to fill one container; documents issued for customs.
- Installation supportAnchoring drawings, video guides and remote support during installation.
This page describes a typical configuration rather than a specific client. Ask us for references in your region.








